1-530-636-0360
Singh360 technician verifying controls work at an open panel

New buildings and major projects

Commissioning

Independent functional testing and issue management that confirms installed systems, controls, and sequences perform as intended.

Talk with Singh360

The operating problem

Start with what is actually happening.

New equipment can be installed and still fail to operate as a coordinated system. A turnover checklist alone does not prove the schedules, setpoints, alarms, safeties, and sequences work under real conditions.

See the Singh360 method

What Singh360 does

  • Review design intent, submittals, sequences, and controls requirements
  • Build practical pre-functional and functional test procedures
  • Test refrigeration, HVAC, lighting, EMS/BMS, electrical, and related interfaces
  • Document deficiencies with field evidence and clear ownership
  • Coordinate responses across controls, mechanical, electrical, refrigeration, and network trades

What to expect

A defined path from scope to verified operation.

The owner gets a traceable path from design intent to tested operation, with unresolved conditions kept visible until they are corrected or formally accepted.

  1. 01

    Establish the test basis

    Translate owner requirements, sequences, submittals, and controls narratives into practical checks for the installed systems.

  2. 02

    Test the integrated operation

    Exercise equipment, safeties, schedules, alarms, and cross-system responses under representative operating modes.

  3. 03

    Drive verified closeout

    Assign deficiencies, coordinate the responsible trades, retain evidence, and retest the completed work.

Typical deliverables

Work products teams can use.

Final scope and format are set for the project. These are the core records that make the work assignable, reviewable, and useful after the engagement.

Commissioning plan

Scope, responsibilities, milestones, systems, and acceptance approach aligned with the project schedule.

Functional test procedures

Field-ready scripts for modes, sequences, safeties, alarms, and integrated responses.

Evidence-based issue log

Observed condition, location, responsible party, response, status, photos, and retest history in one record.

Closeout record

Verified results, open-item disposition, and the operating information the owner needs after turnover.

Verification standard

The work is not finished when the report is issued.

Programming and settings match approved requirements

Equipment and systems respond correctly across operating modes

Deficiencies are retested—not simply marked complete

The owner receives an actionable closeout record

Field and project evidence

Design, field work, and issue closure stay connected.

Commissioning evidence is useful when it shows both the system being tested and the status of the corrective work—not simply a completed checklist.

Singh360 EMS controls overall layout with operator, network, refrigeration, HVAC, lighting, power, metering, walk-in, and case controls
The EMS/BMS overall layout connects operator tools, facility networks, walk-in controls, case controls, rack controls, HVAC, lighting, power, and metering across the store.
Singh360 commissioning deficiency tracking interface
Deficiencies remain assignable and visible through response, correction, and retest.
Singh360 commissioning team reviewing controls and test records at a new facility
The commissioning team reviews controls, test records, and field conditions together before turnover.

Related project and technical evidence

Read the work behind the service.

Discuss commissioning.

Start with the site, system, project, or recurring condition. Singh360 can help define the evidence, scope, responsible parties, and path to verified operation.

Talk with Singh360